[Case Study] Commissioning of a Hyperscale Data Center in Japan
A case that enabled the operation of a hyperscale data center within a specified period and budget.
We would like to introduce a case study that made it possible to conduct performance testing of various scenarios in a hyperscale data center for global enterprises at the Collocation Data Center. In the company's facility, thorough testing and commissioning were essential to ensure that various infrastructures of the data center, such as power and cooling systems, were functioning without issues and to confirm the complete operational capability and fault tolerance of the data center. Aggreko conducted a site survey and determined that a combination of 200kW load devices, LV cables, and connectors was optimal for the customer's data hall. A total of 32 load devices, amounting to 4.8MW, were prepared to simulate the thermal load on the data center's power, cooling, and infrastructure. As a result, it was guaranteed that the system would operate appropriately under various scenarios and meet the stringent industry standards and regulations regarding uptime and energy efficiency. [Case Summary] ■ 200kW Load Devices: 32x ■ LV Cable Length: 11.2km ■ Data Hall Capacity: 4.8MW *For more details, please download the PDF or feel free to contact us.
- Company:Aggreko Japan
- Price:Other